     Before the power to project electrical engineer to check the safety and preinstalled on ring main unit (RMU). I give examples below. 
1. The cleanliness. 
2. No person involved in that area. 
3. Check the out going without a conductor material that could be made. Born to be shot in the circuit. 
4. Check volt phase to complete the 3 phase. 
5. On Ring main unit (RMU). 
6. To label the electrical room. "Danger hight voltage".