installation Busduct.Be prepared. And packing list for each piece rod in the position where Busduct. Education wrist Manual Contains instruction for the installation. Sample1. required clearance for Plug-in unit mounting.2. Hanger any Fixed or spring Hanger.
2.1Compressed length of springs for vertical spring hangers.Tomorrow will tell.
Electrical engineer in Thailand
To share the experience and knowledge of Electrical Engineering and work experience after graduation. Electrical engineering career.
Thursday, September 23, 2010
Sunday, September 19, 2010
On Ring main unit.
Before the power to project electrical engineer to check the safety and preinstalled on ring main unit (RMU). I give examples below.
1. The cleanliness.
2. No person involved in that area.
3. Check the out going without a conductor material that could be made. Born to be shot in the circuit.
4. Check volt phase to complete the 3 phase.
5. On Ring main unit (RMU).
6. To label the electrical room. "Danger hight voltage".
1. The cleanliness.
2. No person involved in that area.
3. Check the out going without a conductor material that could be made. Born to be shot in the circuit.
4. Check volt phase to complete the 3 phase.
5. On Ring main unit (RMU).
6. To label the electrical room. "Danger hight voltage".
Saturday, September 18, 2010
Electrical Engineering
Children experienced Mechanics. There are still no difference with teenage children modern Pan Capacity Mon cut We see online is refractory To be disobedient, I finished university in electrical engineering from the government.
Electrical Engineering and graduated into each other and do some. . Many people choose to learn it and many people suffer for Pan property finance. I have a work and then learn to work with. Or solely the work.
(Photos from. Blog.spu.ac.th.) |
They called for better electrician.
Today .... just before.
Subscribe to:
Posts (Atom)